Exhibitors

TOVO-TEST

Stand: K152
  • | Electric grid
  • | Cooling Systems
  • | Networks and Connectivity
  • | Electricity Generation and Distribution
  • | Design and Construction
There is no room for error when a data center goes into production. During your Integrated Systems Testing (IST Levels 4 and 5) phases, it is critical to accurately simulate the electrical and thermal load. As IT densities increase, standard equipment skews test results by creating unrealistic temperature gradients.

At TOVO-TEST, we design and supply modular load banks capable of replicating the exact behavior of modern infrastructure. We support operators, hosting providers, and hyperscalers with a turnkey service: implementation consulting, delivery logistics, handling, and on-site installation.

Key Expertise & Solutions:

  1. Edge & Room Extension (TT4 Series - 3.5 kW): Ultra-realistic simulation with a Delta T° of 9 to 12°C and dual power supply (channels A/B).
  2. High Density (TT3 Series - 10.5 kW): A 9U rack capable of simulating up to 42 kW within a 36U footprint, with a maximum Delta T° of 16°C.
  3. Heavy-Duty (LB300TT Series - 300 kW): Full-scale validation with a highly competitive Delta T of 35°C at 200 kW.

Get an exclusive look at our new liquid cooling solutions at DCW Paris 2026 and discuss your future test protocols with our team.

Events

Data Centre World Paris

Address

611
AVENUE MARGUERITE PEREY
LIEUSAINT
Sales Department
77127
France
Visit website

Contact us


Loading
See all Exhibitors

Register Now