Medium-Voltage Uninterruptible Power Supplies (UPS): How to Protect 50-MW Power Modules in AI Data Centers?
The rapid growth of high-performance computing infrastructure has led to the need to handle power blocks measuring several tens of megawatts. Under these conditions, the systematic use of multiple low-voltage UPS systems can create constraints in terms of space, cabling, and coordination. Medium-voltage UPS systems offer an alternative approach: protecting and conditioning power before it undergoes transformation and final distribution.
Why move the ASI to the medium-voltage level?
At the same power level, a higher voltage reduces the current and the stress on the conductors. A medium-voltage UPS can protect a group of transformers and low-voltage feeders, rather than duplicating the same functions on each branch. The actual benefit, however, depends on the redundancy topology, the power paths, and the ability to perform maintenance without interrupting the loads.
Managing energy without unnecessarily depleting storage capacity
ABB HiPerGuard technology uses a ZISC (Impedance Isolated Static Converter) architecture, combining an isolation inductor with power converters. It is designed to correct power quality disturbances while avoiding the need to systematically draw on the storage system during events that the converter can compensate for. The batteries are activated during outages that require backup power. The available runtime depends on the actual storage capacity selected and the sustained power output.
The new scale: 20 units and 50 MW
On September 24, 2026 , ABB presented a rigid parallel connection capacity of up to 20 HiPerGuard units, representing a 50 MW UPS array. This more recent information supplements earlier public documents, which still cite 10 units and 25 MW. The equivalent apparent power is 50 MVA at a power factor of unity, assuming 2.5 MVA per unit; the exact limits must be confirmed for the project. Importantly, 50 MW of installed capacity does not equate to 50 MW of usable power after accounting for redundancy reserves. In an N+1 configuration, for example, a 2.5 MW unit taken offline as a reserve would reduce the usable rated capacity to 47.5 MW, subject to applicable sizing rules.
Efficiency and Costs of the Entire Production Line
ABB reports an efficiency of approximately 98% under nominal operating conditions for its product line. At these power levels, even small variations in efficiency significantly affect thermal losses. To compare two architectures, it is necessary to account for losses in transformers, the UPS, cables, auxiliary equipment, and storage, as well as redundancies and part-load operation.
Maintaining Stability with AI Workloads
Server power demands can fluctuate rapidly. The UPS, power controls, and power resources must be sized to prevent these transients from propagating excessively into the upstream grid. The potential for integrating batteries, on-site generation, and grid support functions broadens the scope of the analysis, but does not eliminate the need for dynamic studies and grid connection compliance assessments.
34.5 kV integration, depending on the grid configuration
The 34.5 kV HiPerGuard version, unveiled in 2026, is designed for direct connection to a grid at the same voltage level, thereby eliminating the need for certain intermediate transformers. This advantage applies only when the voltage, protective devices, and overall architecture are compatible.
The core issue remains the campus's electrical resilience: the best architecture is one that ensures power quality and isolates incidents based on the actual maintenance procedures and failure scenarios that have been selected.
Sources:
- https://new.abb.com/news/detail/135106/new-34-5kv-hiperguard-ups-direct-grid-connection-cuts-ai-data-center-power-costs
- https://library.e.abb.com/public/6fc15836d1464f3989eea5094d6cb8d6/9AKK108473A3431_en_A_ABB%27s%20technology%20%26%20solutions%20for%20high-power%20data%20centers.pdf
- https://new.abb.com/ups/systems/medium-voltage-ups/hiperguard/technical-data